Hardeman Groep  ·  more than 30 companies in the construction chain
Hardeman Groep head office with flags at sunset

Hardeman Groep

Building tomorrow’s landscape together

We make building easier. By connecting every link in the chain, from production to installation, projects run faster, smarter and with less risk.

30+
Companies
1,200
Employees
7
Countries
4
FALK production sites worldwide

The strength of the chain

Companies that reinforce each other

The Hardeman Groep is a network of companies that together serve the entire construction chain. What began as a single installation firm grew into a group that produces, processes, supplies and installs.

Because every link is in our own hands, we keep a grip on quality, lead time and price. For clients that means one point of contact, short lines, and a project that keeps moving even when something goes wrong.

01

Production

Sandwich panels, facade elements, precast concrete and steel structures from our own plants.

02

Materials

Steel roofing, profiles, strip steel, reinforcement steel and fastening materials.

03

Processing

Flashings and steel coating: material exactly to size and in the right finish.

04

Installation

Our own teams fit the roof, wall and facade on site.

05

Circular

Residual material back into the chain, so what comes off gets value again.

The companies

Every company a link, together a chain that holds

Every company is a specialist in its own field and keeps its own name and customers. Below are four of the thirty-plus companies; the full overview is one click away.

View all companies More than 30 companies, from production to installation

Hardeman Groep on film

The story of the group

One film, every link: from the first sheet of steel to the last screw on site.

Prefer a bigger screen? Watch the film on Vimeo

Distribution centre on the waterfront built with elements from the Hardeman Groep
Amsterdam Logistic Cityhub — precast concrete from the group

Where the chain comes together

Half the group works on a single distribution centre

A large DC is exactly the kind of project the group was built for. From the reinforcement in the foundation to the last screw in the roof: it comes out of the same chain, with one schedule and one point of contact.

  • FoundationReinforcement steel by Holterman
  • StructurePrecast concrete by Holcon and Haprekon
  • FacadeConcrete parapets by Bisoton, facade elements by COFAC
  • Roof and wallSandwich panels by FALK, cold roof sheets and profiles by DELFT
  • DaylightRooflights by Light Panel
  • DetailingFlashings by MMN and Pantos, coating by Ansova
  • FasteningScrews and fixings by FastenerPoint
  • InstallationHardeman & van Harten on site
  • Residual materialOffcuts and pallets returned via InSus

Sustainability

We collect it again as well

Because we both produce and install, we can take the residual material back from site. Offcuts, pallets and old panels are returned and become raw material for new ones. That is the difference between using less and genuinely working in a circular way.

3,000tonnes

Sandwich offcuts collected through CradleCollect.

84%

Of EPS pallets came back from site.

40% less

Environmental impact with a CradleCore® panel.

50%

Recycled binder in the Circulayer coating.

See how the loop closes CradleCore®, CradleCollect, InSus and Circulayer

What it delivers

If the reinforcement, the concrete, the facade and the roof all come from one group, nobody has to wait for anybody else.
The power of chain controlOne schedule, one point of contact, and a delivery reliability that does not depend on five separate parties.
1point of contact for the entire package
9links that meet on a single distribution centre
215 mtallest project the group supplied to

Worldwide

Rooted in the Netherlands, at home in seven countries

From Ede, Veenendaal and Lunteren we serve the whole of Europe. With locations in Germany, France, Ireland, the United States and Canada, the chain stays close to the project, wherever that project is.

FALK Panels Canada
FALK Panel · Michigan
Europe · 7 locations
North-west Europe in detail

Our story

From installation firm to complete chain

It started with installation. When demand grew faster than suppliers could keep up with, a bottleneck appeared. Instead of waiting, the Hardeman family started producing themselves. That is how FALK came about, and the companies that close the rest of the chain followed.

That reflex has stayed: see a bottleneck, solve it. Today more than thirty companies work together under one name.

1970s

Hardeman & van Harten starts in Lunteren as an installer of roof and wall cladding.

Growth

Craftsmanship and perseverance make the business grow fast. Suppliers can no longer keep up with demand.

2007

FALK starts producing sandwich panels itself. The bottleneck becomes a factory of its own.

2025

FALK takes over production in Veenendaal from Hardeman BV. The chain closes further.

Today

More than thirty companies, locations in seven countries and one shared goal: making building easier.

Every company a specialist. Together we are the Hardeman Groep.
Brand promise Hardeman Groep

Curious what the chain means for your project?

Whether you are a client, a partner or a future colleague: we are happy to think along. One phone call is enough to get the right specialist from the group around the table.